Phone: +44 (0) 1260 295999
Email: sales@safetyscreens.co.uk
Fax: +44 (0) 1260 295998
PVC Strip Curtain Assembly Videos
How To Install a Hook On Face Fit Clear PVC Plastic Strip Curtain
• Fit the top track to the face of the door frame with 3 wood screws
• Sandwich the PVC strip between the stainless steel plates - ensuring the concave
side faces the small plate
• Secure the plate to the PVC curtain with the 3 screws provided
• Hang the PVC strips on the top track at desired overlap
• The PVC strip curtain is now ready to use
How To Install a Hook On Soffit Fit Clear PVC Plastic Strip Curtain
• Fit the top track to the soffit of the door frame with 3 wood screws
• Sandwich the PVC strip between the stainless steel plates - ensuring the concave
side faces the small plate
• Secure the plate to the PVC curtain with the 3 screws provided
• Hang the PVC strips on the top track at desired overlap
• The PVC strip curtain is now ready to use
How To Install a Bolt-On Face Fit Clear PVC Plastic Strip Curtain
• Slide the M8 bolts into the centre slot and along the track.
• The “L” shaped bracket can be used in any configuration that best suits your requirement.
• Place the bracket over the M8 bolt and tighten into position using the washer
and nut.
• Place the brackets no more than 1200mm apart and no more than 200mm in from each
end of the track.
• Slide the required number of M8 bolts down both sides of the track ready to receive
the curtain strips.
• Secure the brackets with track attached to the brickwork and concrete with rawl-bolts
to steelwork with high tensile nuts and bolts and to timber with coach screws or
large gauge wood screws.
• Push each pre drilled strip over the bolts with the concave side facing the track.
• Hold each strip to the track using the aluminium plate, thread the M8 nuts onto
the bolts but do not tighten fully.
• Slide the strip to the desired starting place before tightening the nuts.
• If you are including Red warning strips remember to position these first.
• To achieve 100% overlap each strip must butt up to the next on both sides of the
track, for 50% overlap each strip should be placed at a distance from each other
that it overlaps by a quarter of the width of each strip.
• Finally trim the bottom of each strip to the desired length using a sharp knife.
How To Install a Bolt-On Soffit Fit Clear PVC Plastic Strip Curtain
• Slide the M8 nuts into the centre slot and along the track.
• Place the brackets over the M8 nuts and tighten into position using the countersunk
bolts.
• Place the brackets no more than 1200mm apart and no more than 200mm in from each
end of the track.
• The 'L' shapes brackets should be arranged so that each alternate bracket is facing
the opposite side of the track.
• Slide the required number of M8 bolts down both sides of the track ready to receive
the curtain strips.
• Secure the brackets with track attached to the brickwork and concrete with rawl-bolts
to steelwork with high tensile nuts and bolts and to timber with coach screws or
large gauge wood screws.
• Push each pre drilled strip over the bolts with the concave side facing the track.
• Hold each strip to the track using the aluminium plate, thread the M8 nuts onto
the bolts but do not tighten fully.
• Slide the strip to the desired starting place before tightening the nuts.
• If you are including Red warning strips remember to position these first.
• To achieve 100% overlap each strip must butt up to the next on both sides of the
track, for 50% overlap each strip should be placed at a distance from each other
that it overlaps by a quarter of the width of each strip.
• Finally trim the bottom of each strip to the desired length using a sharp knife.
How To Install a Sliding Bolt-On Clear PVC Plastic Strip Curtain
• Push the sliding track brackets over the sliding track and position at intervals
of no more than 1.2 metres.
• Level the track and brackets before securing to brickwork and concrete with rawl-bolts,
to steelwork with high tensile nuts & bolts and to timber with coach screws or large
gauge wood screws.
• Place the roller assembly over the M8 bolt and tighten into position using the
washer and nut
• Place the rollers no more than 1200mm apart and no more than 200mm in from each
end of the track.
• Slide the required number of M8 bolts down both sides of the track ready to receive
the curtain strips.
• Push each pre drilled strip over the bolts with the concave side facing the track.
• Hold each strip to the track using the aluminium plate, thread the M8 nuts onto
the bolts but do not tighten fully.
• Slide the strip to the desired starting place before tightening the nuts.
• To achieve 100% overlap each strip must butt up to the next on both sides of the
track, for 50% overlap each strip should be placed at a distance from each other
that it overlaps by a quarter of the width of each strip.
• Fix an M8 nut and bolt through the side and at each end of the sliding track to
stop the track from sliding out.
© SAFETY SCREENS LTD | Unit 11 Green Farm Trading Est | Greenfield Road | Congleton
| Cheshire | CW12 4TR